We design highly modular innovative and reliable data centres with minimum CAPEX & OPEX, high ROI and low PUE
A holistic data centre life cycle approach is critical in the highly competitive data centre market. A strong focus on the CAPEX at the start of the projects could lead to high OPEX costs over the life span of the data centre. Consequently, the risk, return of investment (ROI) and Power Usage Effectiveness (PUE) need to align, alongside other critical business priorities such as sustainability targets. At Deerns we step up to this challenge, balancing these critical aspects.
Our consultancy and design services respond to your challenges
Deerns has a full service portfolio which provides data centre clients with a single point of contact for the entire data centre life-cycle stages and consultancy. We provide design, construction management, operations support and expert services (modelling and analysis) as well as overall project management.
The process below details the services Deerns provides in response to critical business challenges
Data Centre Strategy
Data Centre Implementation
Business Optimisation (ROI, Reliability, Adaptability)
REALISATION
EXCELLENT OPERATIONS
Consultancy
- Data Centre Roadmap
- Site Requirements
- Budget Cost
- Due Diligence (technical & site selection)
- Site Master Planning
- Utility availability sites
Design & Engineering
- Technology selection
- Scenario planning & modelling
- Select & develop best concept
- Detailed design documents
- End-to-end tender management
- BIM
Assurance
- Technology selection
- Scenario planning & modelling
- Select & develop best concept
- Detailed design documents
- End-to-end tender management
- BIM
OPEX
- Maintenance planning & management
- PUE, WUE, EUE, CO2
- TCO & Investment prioritising
- Building system characteristics
- Airflow management
- CFD Modelling
- Building Physics
- Thermal Analysis
Reliability
- Reliability simulation analysis
- Audits, second opinions
- Tier & TIA audits
- SPOF analysis
- Security audit
- Fire Safety
- Procedures & protocol
- Staff Training
- Change management
Asset Utilisation
- Virtual DC model
- Digital twins
- Digital record documentation
- IT capacity control metering & DCIM
- Site & strategic planning
- Migration & expansion
- Life cycle analysis
- Structured cabling review